Our factory has a total area of about 60,000 ㎡
The construction engineering has been divided into three phases.
Phase-I: the steel component workshop and the aluminum veneer workshop were completed in September 2011, and started production;
Phase II: In November 2013, the workshop for manufacturing aluminum alloy curtain walls, doors and windows was established, and started production.
Phase-III: an automatic fluorocarbon coating line was established in December 2015, and started production.
![Curtain wall workshop](/uploads/c5a47462.jpg)
Curtain Wall Workshop
Our company is capable of producing and processing 60,000 square meters of glass curtain walls......
![alumium sheet workshop](/uploads/455a08d4.jpg)
Alumium Sheet Workshop
Our company is capable of producing and processing 150,000 square meters of aluminum sheets......
![Metal plate workshop](/uploads/21e8a8ba.jpg)
Metal Plate Workshop
![Stainless-steel workshop](/uploads/9a52fec2.jpg)
Stainless-Steel Workshop
Our company is capable of producing and processing 500 tons of stainless-steel products for a long term......
![Steel structure workshop](/uploads/c41db508.jpg)
Steel Structure Workshop
Our company is capable of producing and processing 3,600 tons of steel structural parts......